vis-workflow
Use when planning an IEEE VIS project timeline from area fit through the abstract and full-paper deadlines, the two-phase review, the conditional-accept second round, the IEEE TVCG camera-ready, the Graphics Replicability Stamp, and presentation, with backward-planning offsets for a visualization paper and honest handling of the annual cycle and the second-round revision window.
npx skills add brycewang-stanford/Awesome-Journal-Skills --skill vis-workflow --agent claude-code
Same command for any agent — swap --agent for codex, cursor, copilot.
Weekly change comes from our own snapshots, not the repository page — it measures attention, not adoption.
# VIS Workflow Use this as the project-management skill for an IEEE VIS submission. Replace every date with the current official timetable and work backwards from the **abstract** deadline — which precedes the full-paper deadline and locks your author list. VIS publishes in **IEEE TVCG**, so plan for a likely **conditional-accept second round** inside the review cycle, not just an accept/reject. VIS is a conference whose full papers are journal articles: the **conference** has no standing editor-in-chief, and the rotating analogue is the per-edition VIS Executive Committee, Overall Paper Chairs, and the six Area Paper Chairs (verify the roster on the current organizing page — **待核实** beyond named chairs). The cost model is conference registration; at least one author presents. ## Milestones - **Area fit:** confirm VIS over a sibling venue and pick the **primary area** among the six (`vis-topic-selection`). - **Evidence lock:** freeze the contribution type, the design rationale, the study/benchmark design, and the supplemental video plan. - **Abstract:** submit real title, abstract, **final author list**, primary area, and keywords by the abstract deadline (VIS 2026: 21 March 2026).
- Milestones
- Backward plan from the paper deadline
- The annual-cycle reality
- Failure modes by stage
- Coordination notes
- Output format
What does the vis-workflow skill do?
Use when planning an IEEE VIS project timeline from area fit through the abstract and full-paper deadlines, the two-phase review, the conditional-accept second round, the IEEE TVCG camera-ready, the Graphics Replicability Stamp, and presentation, with backward-planning offsets for a visualization paper and honest handling of the annual cycle and the second-round revision window.
How do I install it?
Run `npx skills add brycewang-stanford/Awesome-Journal-Skills --skill vis-workflow --agent claude-code` — it drops the skill into your project so the agent can pick it up. Swap the --agent value for codex, cursor or copilot if you use one of those.
Where does this skill come from?
From brycewang-stanford/Awesome-Journal-Skills, a repository with 909 stars. We read it straight from the repository tree rather than a submitted listing, so what you see here is what is actually published.
Is a popular skill a good skill?
Not necessarily. Stars measure attention, not adoption — a repository can trend for a week and be abandoned. That is why we show the weekly change from our own snapshots next to the total, instead of a single flattering number.